The project
This was a forestry mapping project for a government client in Uttarakhand. It was the toughest mapping job of my career, because of the terrain. I led the project and its operations, with two drone pilot teams.
The planned scope was about 400 km².
What the terrain allowed
Large parts of the planned area were not approachable for the pilot teams because of the terrain. The two teams completed data capture for 77 km², with no drone crashes.
The scope was about 400 km² and the area delivered was 77 km². The rest of it could not be reached.
What was delivered
The deliverables were the same four outputs, and the project took roughly 45 days to complete.
Orthomosaic
One georeferenced, distortion-corrected image of the whole area, stitched from the drone photos.
Shows what is on the ground.DTM
The height of the bare ground, with trees and buildings removed.
Shows how the ground rises and falls.Contour maps
Lines of equal elevation, drawn from the terrain model.
Makes slope readable at a glance.Point clouds
The 3D measurements the other products are built from.
Source data for checks and re-processing.Why I am writing it up
Not every scope can be flown. On this project the terrain set the limit, and the result was 77 km² with no drone crashes. If you have difficult terrain to map, tell us about it.